Jackson West Medical Middle Doral Campus
Jackson Well being System (Miami, Fla.) wished to enhance entry to look after an underserved zone of Miami-Dade County by delivering the Jackson Well being Doral campus in Doral, Fla. It’s the primary hospital within the metropolis.
The $153 million challenge is located simply west of the Palmetto Expressway, one of many major transportation spines for Doral. It contains the 605,000-square-foot, six-story hospital that homes 98 licensed beds with 84 medical/surgical beds; eight intensive care unit beds; and 6 labor, supply, restoration, and postpartum beds.
As well as, the challenge contains an built-in pediatric and grownup emergency division, built-in outpatient surgical procedure middle, medical pavilion with doctor places of work, laboratory, retail pharmacy, and open inexperienced area.
The campus can be supported by an 875-car parking facility.
Expertise-driven design
Designed by Perkins&Will (Miami), the campus was designed to supply the area and the neighborhood of Doral with the most recent in expertise.
Efforts embody concierge and kiosk providers for on-line and just-in-time scheduling and absolutely digital medical data and scheduling system built-in into every affected person room. The power additionally homes civic, training, and innovation facilities, together with classroom area for brand new and up to date moms and fogeys on the maternity ground.
Undertaking particulars for Jackson West Medical Middle Doral Campus:
Location: Doral, Fla.
Completion Date: August 2021
Proprietor: Jackson Well being System
Complete constructing space: 605,000 sq. ft.
Complete building price: $153 million
Structure agency: Perkins&Will
Inside designer: Perkins&Will
Common contractor: Yates Development
Engineering: BR+A, BNI Engineers
Builder: Yates Development